2009-06-01

Making progress on projects

During Memorial Day weekend, we ripped out the front door and the glass side lites on either side of it, built new walls, and framed in a new door. We drywalled the inside, insulated it, caulked it, and now it's almost ready for painting. We got it done in the space of two days.

This past weekend, we stuccoed the outside of the wall. That was sort of fun, in that we had no idea what we were doing. But we put up metal mesh for the stucco to stick to, and slathered on the concrete, and it looks very nice. It's supposed to dry for six weeks before we paint it.

Then we cut and installed door trim for a few doors, which was a project that had been neglected since February.

It was a productive weekend.

Bookmark and Share

1 comments:

Dave Coulter said...

Chip away at that honey-do list ;)

Template by - Abdul Munir | Daya Earth Blogger Template